2026-11-07 UNCONFIRMED note at MAS
VickiCocks15 says the 6 to 7 Nov road delay was used to move one of the large valve skids from Sanchez to Massey's; RGVaerialphotos says cryo plumbing sections built in the Sanchez lot were moving to Massey's on 8 Nov.
@VickiCocks15 X post Counts with a second source @RGVaerialphotos X post Counts with a second source
- happened
2026-11-06 UNCONFIRMED note at MAS
Two Production to Massey's road delays on Texas State Highway 4: 23:59 Friday 6 Nov to 04:00 Saturday 7 Nov CT, and 23:59 Saturday 7 Nov to 04:00 Sunday 8 Nov CT.
@LabPadre X post Counts with a second source @VickiCocks15 X post Counts with a second source
- happened
2026-11-06 UNCONFIRMED note at MAS about S43.1
RGVaerialphotos shows Ship 43.1 in the can crusher at Massey's.
@RGVaerialphotos X post Counts with a second source
- happened
2026-11-03 UNCONFIRMED note at MAS
VickiCocks15 says the Massey's LR11000 crane removed a reaction frame from the Super-crusher on 3 Nov, after moving on from the LOX header tank structure the day before; a beam was removed on 30 Oct.
@VickiCocks15 X post Counts with a second source
- departed
2026-10-30 transport B23 from MAS to MB1
Booster 23 left Massey's early on 30 Oct (local time), drove back along Highway 4 and returned to Mega Bay 1 at the production site.
@LabPadre X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RoughRidersShow X post Counts with a second source @VickiCocks15 X post Counts with a second source
- departed
2026-10-29 transport S42 from MAS to MB2
Ship 42 left Massey's on Highway 4 late on 28 Oct (local time) after completing its static fire testing campaign, arrived back at the production site early on 29 Oct, was moved into Mega Bay 2 and lifted off its stand.
@TrackingTheSB X post Confirms alone @VickiCocks15 X post Counts with a second source @LabPadre X post Counts with a second source @RGVaerialphotos X post Counts with a second source
- happened
2026-10-29 UNCONFIRMED note at MAS
The tiled ship barrel section that went to Massey's with Ship 42, and had been anchored near the flame trench during testing, left Massey's with the ship and arrived back at the production site.
@RGVaerialphotos X post Counts with a second source @VickiCocks15 X post Counts with a second source
- happened
2026-10-28 UNCONFIRMED note at MAS about S42
VickiCocks15 says Ship 42's flaps were retracted on the morning of 28 Oct, and that afternoon the ship left the test station and moved a short way towards the Massey's exit to wait for the trip back to Mega Bay 2.
@VickiCocks15 X post Counts with a second source
- arrived
2026-10-28 transport B23 from MB1 to MAS
Booster 23 was placed on the cryogenic proof stand at Mega Bay 1 and then left the production site for Massey's again early on 28 Oct (local time) for cryo testing.
@TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source @NASASpaceflight X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @TrackingTheSB X post Confirms alone @LabPadre X post Counts with a second source @VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source
- happened
2026-10-28 UNCONFIRMED note at MAS about S42
VickiCocks15 says it looks like Ship 42 will be coming back to Mega Bay 2 on the night of 28 Oct (local time), after its static fire testing at Massey's.
@VickiCocks15 X post Counts with a second source
- happened
2026-10-28 note at MAS about S42
SpaceX said Ship 42's static fires are complete: the Starship preparing for Flight 15 performed a full-duration six-engine static fire and fired a single Raptor engine to simulate a deorbit burn.
@SpaceX X post Confirms alone @FelixSchlang X post Counts with a second source
- happened
2026-10-28 UNCONFIRMED note at MAS
The City of Starbase lists a Massey's to Production road delay from Wed 28 Oct 23:59 CT to Thu 29 Oct 04:00 CT.
@FelixSchlang X post Counts with a second source
- happened
2026-10-28 UNCONFIRMED note at MAS about B23
FelixSchlang says Booster 23 is expected to begin a second round of cryogenic testing at Massey's, where it sat alongside Ship 42.
@FelixSchlang X post Counts with a second source
- happened
2026-10-27 static-fire S42 at MAS
Ship 42 completed a six-engine, full-duration static fire test at Massey's on 27 Oct (local time), about 60 seconds long, following its single-engine static fire the evening before.
@NASASpaceflight X post Counts with a second source @TrackingTheSB X post Confirms alone @LabPadre X post Counts with a second source @Blobifie X post Counts with a second source @RoughRidersShow X post Counts with a second source @StarshipGazer X post Counts with a second source @VickiCocks15 X post Counts with a second source @SpaceX X post Confirms alone
- happened
2026-10-26 UNCONFIRMED note at MAS
RGVaerialphotos posted aerial photos of Massey's test site 1 and the construction progress of test site 2 as of 26 Oct.
@RGVaerialphotos X post Counts with a second source
- happened
2026-10-26 static-fire S42 at MAS
Ship 42 completed a single-engine static fire test at Massey's on the evening of 26 Oct (local time), after a depress vent signalled a single-engine burn.
@NASASpaceflight X post Counts with a second source @LabPadre X post Counts with a second source @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @FelixSchlang X post Counts with a second source @CeaserG33 X post Counts with a second source @VickiCocks15 X post Counts with a second source @FelixSchlang X post Counts with a second source
- happened
2026-10-26 UNCONFIRMED note at MAS
The City of Starbase lists a Production to Massey's road delay from Tue 27 Oct 23:59 CT to Wed 28 Oct 04:00 CT.
@FelixSchlang X post Counts with a second source @VickiCocks15 X post Counts with a second source
- arrived
2026-10-26 transport S42 to MAS
Ship 42 rolled from the production site down Highway 4 to Massey's for static fire testing, followed by a ship aft barrel section with some tiles on it.
@Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source @RGVaerialphotos X post Counts with a second source @FelixSchlang X post Counts with a second source
- happened
2026-10-26 UNCONFIRMED note at MAS about S42
Ship 42 was detanked after its single-engine static fire at Massey's.
@Blobifie X post Counts with a second source
- happened
2026-10-25 UNCONFIRMED note at MAS about S43.1
TrackingTheSB weekly: test tank S43.1's earlier crumple was repaired and it was tested again at Massey's this week.
@TrackingTheSB X post Confirms alone
- departed
2026-10-25 transport S43 from MAS to MB2
Ship 43 left Massey's after its cryo proof testing and rolled up Highway 4 back to Mega Bay 2 at the production site overnight (local night of 25 Oct).
@NASASpaceflight X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @FelixSchlang X post Counts with a second source @VickiCocks15 X post Counts with a second source
- happened
2026-10-25 UNCONFIRMED note at MAS about S42
VickiCocks15 expects Ship 44 to move to the centre stand and Ship 43 and Ship 42 to swap places at Massey's in the night transport move, for an S42 static fire test.
@VickiCocks15 X post Counts with a second source
- happened
2026-10-24 UNCONFIRMED note at MAS
The City of Starbase lists road delays from Massey's to Production and Production to Massey's on Sun 25 Oct, 22:00 CT to Mon 26 Oct 04:30 CT.
@FelixSchlang X post Counts with a second source
- happened
2026-10-23 UNCONFIRMED note at MAS about S43
Blobifie says Ship 43 completed two cryogenic proof tests at Massey's on 23 Oct.
@Blobifie X post Counts with a second source
- happened
2026-10-23 cryo S43 at MAS
Ship 43 started its first cryogenic proof test at Massey's on the evening of 23 Oct.
@TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @VickiCocks15 X post Counts with a second source
- happened
2026-10-23 UNCONFIRMED note at MAS
The City of Starbase lists a Production to Massey's road delay from 23:59 Saturday 24 Oct to 04:00 Sunday 25 Oct CT.
@FelixSchlang X post Counts with a second source
- happened
2026-10-22 filing FAA airspace at MAS
FAA TFR FDC 6/1671 near Brownsville, issued 22 Oct 2026 at 14:42 UTC with SpaceX as point of contact: a 1.5 nm radius from the surface to 5,000 ft AGL, centred 25°57'02"N 97°14'59"W, from 23 Oct 05:00 UTC to 6 Nov 05:00 UTC. LabPadre and VickiCocks15 place it at Massey's.
FAA Web page Confirms alone @LabPadre X post Counts with a second source @VickiCocks15 X post Counts with a second source
- arrived
2026-10-22 transport S43 from MB2 to MAS
Ship 43 was lifted onto the ship cryo stand, rolled out of Mega Bay 2 and set off along Highway 4 to Massey's for cryogenic proof testing.
@Blobifie X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @LabPadre X post Counts with a second source @Blobifie X post Counts with a second source
- happened
2026-10-22 UNCONFIRMED note at MAS about S43
Ship 43 moved its flaps at Massey's.
@VickiCocks15 X post Counts with a second source
- happened
2026-10-21 UNCONFIRMED note at MAS about S43.1
Test tank 43.1 went through a 10th round of testing at Massey's overnight, a relatively short test with little other than venting visible.
@VickiCocks15 X post Counts with a second source
- departed
2026-10-18 transport B23 from MAS to MB1
Booster 23 left Massey's after completing cryogenic proof testing and is headed back to the production site on Highway 4.
@RoughRidersShow X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source
- happened
2026-10-18 UNCONFIRMED note at MAS about S43.1
TrackingTheSB weekly: S43.1 is a ship nosecone and header tank test article. It shows visible buckling around the nosecone tip, which the post says likely happened during a test on 14 Oct, with sensors placed around the buckled area.
@TrackingTheSB X post Confirms alone
- happened
2026-10-16 UNCONFIRMED note at MAS
A road delay is posted for the night of 16 Oct, from Massey's to the production site, between 23:59 and 04:00. The post says this does not necessarily mean the delay is for the booster tested at Massey's the night before.
@VickiCocks15 X post Counts with a second source
- happened
2026-10-15 UNCONFIRMED note at MAS about B23
Aerial view shows Booster 23 at Massey's.
@RGVaerialphotos X post Counts with a second source
- happened
2026-10-15 UNCONFIRMED note at MAS about S43.1
S43.1 nosecone tip appears slightly crumpled during testing at Massey's. When that happened and how it affects remaining tests is unclear.
@NASASpaceflight X post Counts with a second source @RGVaerialphotos X post Counts with a second source
- happened
2026-10-15 cryo B23 at MAS
Booster 23 underwent its first cryogenic proof test at Massey's.
@Blobifie X post Counts with a second source @FelixSchlang X post Counts with a second source @NASASpaceflight X post Counts with a second source @StarshipGazer X post Counts with a second source @Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source
- happened
2026-10-14 UNCONFIRMED note at MAS
Massey's is being cleared ahead of testing. Rough Riders asks whether Booster 23 is next; that is a question, not a confirmation.
@RoughRidersShow X post Counts with a second source
- happened
2026-10-13 other S43.1 at MAS
S43.1 tested inside the Supercrusher at Massey's overnight.
@VickiCocks15 X post Counts with a second source
- arrived
2026-10-13 transport B23 from MB1 to MAS
Booster 23 rolled from the production site to Massey's for its initial cryo proof testing.
@CeaserG33 X post Counts with a second source @TrackingTheSB X post Confirms alone @StarshipGazer X post Counts with a second source
- departed
2026-10-10 transport S42 from MAS to MB2
Ship 42 returned to Mega Bay 2 after its third round of testing at Massey's.
@VickiCocks15 X post Counts with a second source
- happened
2026-10-09 cryo S42 at MAS
Ship 42 frosted on both tanks during cryo testing.
@TrackingTheSB X post Confirms alone
- arrived
2026-10-09 transport S42 from MB2 to MAS
Ship 42 rolled to Massey's on the ship cryo stand after all 6 engines were removed.
@TrackingTheSB X post Confirms alone @StarshipGazer X post Counts with a second source
- happened
2026-10-09 UNCONFIRMED note at MAS about S42
Reported by 9 Oct: SpaceX removed all six engines from S42 and rolled it to Massey's for a third time, onto the ship cryo-proof stand. NSF says this work needs thrust ram testing, not just a cryo proof, before a static fire.
NASASpaceflight Web page Counts with a second source
- arrived
2026-10-08 transport OG can crusher to MAS
The original can crusher moved to Massey's.
@TrackingTheSB X post Confirms alone
- happened
2026-10-06 UNCONFIRMED cryo BLT-TA at MAS
Booster landing tank test article appeared to burst near its base during a cryo test, spilling liquid nitrogen. Intentional or not is unconfirmed.
@TrackingTheSB X post Confirms alone
- arrived
2026-10-04 transport S39.1 to MAS
S39.1 rolled from the production site back to Massey's. Reason unclear.
@TrackingTheSB X post Confirms alone
- departed
2026-09-12 transport B22 from MAS to MB1
Booster 22 finished cryo proof testing at Massey's and was moved back to Mega Bay 1 at the production site.
@TrackingTheSB X post Confirms alone @VickiCocks15 X post Counts with a second source
- happened
2026-09-11 UNCONFIRMED note at MAS about B22
Blobifie says Booster 22 completed what looked to have been a partial cryo test at Massey's and was then detanked.
@Blobifie X post Counts with a second source
- happened
2026-09-09 cryo B22 at MAS
Booster 22 completed a full cryo test at Massey's, filled and held at pressure before detanking, from the afternoon into the night of 9 Sep.
@Blobifie X post Counts with a second source @LabPadre X post Counts with a second source @VickiCocks15 X post Counts with a second source
- arrived
2026-09-08 UNCONFIRMED transport B22 from MB1 to MAS
Booster 22 rolled from Mega Bay 1 to the Massey's test site and was lifted onto the cryo stand for cryo proof testing.
@Blobifie X post Counts with a second source @Blobifie X post Counts with a second source