Skip to content
StarshipDesk.

Field Journal / sourced daily

Explore
OverviewFlight readiness
Feed (Atom)

FIELD JOURNAL / MISSION

Flight 16 (Starlink 30-1)

The mission dossier: target, assigned hardware, milestones and sources.

Recorded target
NET 10 Dec 2026 unconfirmed
Assigned hardware
S43 unconfirmed · B23 unconfirmed

FROM THE PHOTOGRAPHIC ARCHIVE

Starship beside its steel launch tower at sunset.
The tower at sunsetArchive · 15 Apr 2023 · Starship Test Flight Mission · SpaceX · CC BY-NC 2.0. Resized; display crop may apply.

Historical programme image. Open F16 source gallery →

Next flight

Flight 16 (Starlink 30-1) readiness

No outcome claim yet.

The next flight whose NET is on or after 2026-11-16. Vehicles, test steps, the launch pad, ground notes, filings and launch notices are ledger claims. A test step uses the same words as /tests/. A launch notice closes only when a filing, a notice or an official post states that step. Open means that step is not in the ledger. An open box is not a date and not a prediction. A dated box means the ledger recorded that step, not that it passed, and the steps are a reading guide, not a required launch sequence. A dashed box with a date is a mention, not a structured test record.

NET 2026-12-10 at LC-39A UNCONFIRMED c-7dc009ede861

Flight 16 (Starlink 30-1) launch week hub: countdown, window, status timeline and latest updates.

Flight 16 (Starlink 30-1) readiness checklistbooster B23 assigned 2026-10-09 c-b95baad8d0df UNCONFIRMEDB23booster2026-10-09UNCONFIRMEDship S43 assigned 2026-10-09 c-414aea6fef9f UNCONFIRMEDS43ship2026-10-09UNCONFIRMEDB23 cryo test 2026-10-15 c-1bef3acffd6aB23cryo2026-10-15B23 proof test 2026-10-15 c-1bef3acffd6aB23proof2026-10-15B23 static fire open, not in the ledgerB23static fireopenB23 spin prime open, not in the ledgerB23spin primeopenB23 wet dress open, not in the ledgerB23wet dressopenB23 thrust sim mention 2026-10-12 c-6035f45c4d1dB23thrust sim2026-10-12B23 burst open, not in the ledgerB23burstopenS43 cryo test 2026-10-23 c-92e826155d19S43cryo2026-10-23S43 proof test 2026-10-23 c-92e826155d19S43proof2026-10-23S43 static fire open, not in the ledgerS43static fireopenS43 spin prime open, not in the ledgerS43spin primeopenS43 wet dress open, not in the ledgerS43wet dressopenS43 thrust sim mention 2026-10-22 c-f40a40a79002 UNCONFIRMEDS43thrust sim2026-10-22UNCONFIRMEDS43 burst open, not in the ledgerS43burstopenLC-39A pad 2026-10-08 c-7dc009ede861 UNCONFIRMEDpad39A2026-10-08UNCONFIRMEDdeluge note 2026-10-25 c-03f9d2061ae3 UNCONFIRMEDpaddeluge2026-10-25UNCONFIRMEDchopsticks note 2026-07-03 c-5eec7a5ff274 UNCONFIRMEDpadchopsticks2026-07-03UNCONFIRMEDBQD open, not in the ledgerpadBQDopenSQD open, not in the ledgerpadSQDopenFAA open, not in the ledgerFAAopenopenFCC open, not in the ledgerFCCopenopenNOTAM, launch area open, not in the ledgerNOTAMlaunchopenNOTAM, ship splashdown open, not in the ledgerNOTAMsplashdownopenUSCG notice to mariners open, not in the ledgerUSCGmarinersopenNGA navigational warning open, not in the ledgerNGAwarningopenFAA operations advisory open, not in the ledgerFAAadvisoryopenlaunch road closure open, not in the ledgerroadclosureopenwet dress rehearsal open, not in the ledgerwet dressrehearsalopenpayload loaded open, not in the ledgerpayloadloadedopen
Text equivalent of the checklist. Open means the ledger has no claim for that step.
StepStatusDateClaim
booster B23assigned2026-10-09c-b95baad8d0df UNCONFIRMED
ship S43assigned2026-10-09c-414aea6fef9f UNCONFIRMED
B23 cryotest2026-10-15c-1bef3acffd6a
B23 prooftest2026-10-15c-1bef3acffd6a
B23 static fireopenopennot in the ledger
B23 spin primeopenopennot in the ledger
B23 wet dressopenopennot in the ledger
B23 thrust simmention2026-10-12c-6035f45c4d1d
B23 burstopenopennot in the ledger
S43 cryotest2026-10-23c-92e826155d19
S43 prooftest2026-10-23c-92e826155d19
S43 static fireopenopennot in the ledger
S43 spin primeopenopennot in the ledger
S43 wet dressopenopennot in the ledger
S43 thrust simmention2026-10-22c-f40a40a79002 UNCONFIRMED
S43 burstopenopennot in the ledger
LC-39Apad2026-10-08c-7dc009ede861 UNCONFIRMED
delugenote2026-10-25c-03f9d2061ae3 UNCONFIRMED
chopsticksnote2026-07-03c-5eec7a5ff274 UNCONFIRMED
BQDopenopennot in the ledger
SQDopenopennot in the ledger
FAAopenopennot in the ledger
FCCopenopennot in the ledger
NOTAM, launch areaopenopennot in the ledger
NOTAM, ship splashdownopenopennot in the ledger
USCG notice to marinersopenopennot in the ledger
NGA navigational warningopenopennot in the ledger
FAA operations advisoryopenopennot in the ledger
launch road closureopenopennot in the ledger
wet dress rehearsalopenopennot in the ledger
payload loadedopenopennot in the ledger

Vehicles

  1. 2026-10-09 booster B23 UNCONFIRMED assign B23 as booster on F16

    Assign Booster 23 as the booster on Flight 16. NSF names B23 with S43 for the first LC-39A Starship flight; on 15 Oct NSF again tied B23 cryo at Massey's to Flight 16.

    NASASpaceflight Web page Counts with a second source @NASASpaceflight X post Counts with a second source

    c-b95baad8d0df

  2. 2026-10-09 ship S43 UNCONFIRMED assign S43 as ship on F16

    Assign Ship 43 as the ship on Flight 16. NSF names S43 with B23 for the first LC-39A Starship flight (Starlink Group 30-1).

    NASASpaceflight Web page Counts with a second source @NASASpaceflight X post Counts with a second source

    c-414aea6fef9f

B23 test steps

B23, booster. Test log. A TEST is a test effect. A MENTION is a claim whose own text names a test word and is not a test effect. Same grouping as /tests/.

  1. 2026-10-28 MENTION B23 UNCONFIRMED note at MAS about B23

    FelixSchlang says Booster 23 is expected to begin a second round of cryogenic testing at Massey's, where it sat alongside Ship 42.

    @FelixSchlang X post Counts with a second source

    c-0965be309f20

  2. 2026-10-28 MENTION B23 transport B23 from MB1 to MAS

    Booster 23 was placed on the cryogenic proof stand at Mega Bay 1 and then left the production site for Massey's again early on 28 Oct (local time) for cryo testing.

    @TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source @NASASpaceflight X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @TrackingTheSB X post Confirms alone @LabPadre X post Counts with a second source @VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source

    c-95ba597c2974

  3. 2026-10-18 MENTION B23 transport B23 from MAS to MB1

    Booster 23 left Massey's after completing cryogenic proof testing and is headed back to the production site on Highway 4.

    @RoughRidersShow X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source

    c-1c97cb812751

  4. 2026-10-18 MENTION B23 UNCONFIRMED note at MB1 about B23

    NSF (18 Oct): Booster 23's cryo testing at Massey's concluded over the weekend with a Sunday morning trip back to Mega Bay 1 for engine installation.

    NASASpaceflight Web page Counts with a second source

    c-386222a51fc6

  5. 2026-10-18 MENTION B23 note about B23

    TrackingTheSB weekly: Booster 23 completed only one cryogenic proof test at Massey's before rolling back to the production site. Every previous booster apart from BN3 in 2021 did at least two; the cause of the early end is not known.

    @TrackingTheSB X post Confirms alone

    c-59ce046b7e06

  6. 2026-10-15 TEST cryo B23 cryo B23 at MAS

    Booster 23 underwent its first cryogenic proof test at Massey's.

    @Blobifie X post Counts with a second source @FelixSchlang X post Counts with a second source @NASASpaceflight X post Counts with a second source @StarshipGazer X post Counts with a second source @Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source

    c-1bef3acffd6a

  7. 2026-10-13 MENTION B23 transport B23 from MB1 to MAS

    Booster 23 rolled from the production site to Massey's for its initial cryo proof testing.

    @CeaserG33 X post Counts with a second source @TrackingTheSB X post Confirms alone @StarshipGazer X post Counts with a second source

    c-2d6f81b4f7d1

  8. 2026-10-12 MENTION B23 lift B23 to MB1

    Booster 23 lifted onto the booster cryo / thrust sim stand.

    @Blobifie X post Counts with a second source @LabPadre X post Counts with a second source

    c-6035f45c4d1d

  9. 2026-10-09 MENTION B23 UNCONFIRMED assign B23 as booster on F16

    Assign Booster 23 as the booster on Flight 16. NSF names B23 with S43 for the first LC-39A Starship flight; on 15 Oct NSF again tied B23 cryo at Massey's to Flight 16.

    NASASpaceflight Web page Counts with a second source @NASASpaceflight X post Counts with a second source

    c-b95baad8d0df

  10. 2026-09-25 MENTION B23 note about B23

    Booster 23 CH4 tank stack was stacked on top of its aft section, completing major construction; outfitting comes next, ahead of cryo proof.

    @TrackingTheSB X post Confirms alone

    c-722494cd2662

S43 test steps

S43, ship. Test log. A TEST is a test effect. A MENTION is a claim whose own text names a test word and is not a test effect. Same grouping as /tests/.

  1. 2026-10-26 MENTION S43 UNCONFIRMED note at MB2 about S43

    Ship 43 was lifted from the cryo stand at Mega Bay 2 as Booster 22 returned, and the cryo stand then rolled back to Sanchez.

    @VickiCocks15 X post Counts with a second source

    c-c6eb3bcc838c

  2. 2026-10-25 MENTION S43 transport S43 from MAS to MB2

    Ship 43 left Massey's after its cryo proof testing and rolled up Highway 4 back to Mega Bay 2 at the production site overnight (local night of 25 Oct).

    @NASASpaceflight X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @FelixSchlang X post Counts with a second source @VickiCocks15 X post Counts with a second source

    c-048623d211ce

  3. 2026-10-23 TEST cryo S43 cryo S43 at MAS

    Ship 43 started its first cryogenic proof test at Massey's on the evening of 23 Oct.

    @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @VickiCocks15 X post Counts with a second source

    c-92e826155d19

  4. 2026-10-23 MENTION S43 UNCONFIRMED note at MAS about S43

    Blobifie says Ship 43 completed two cryogenic proof tests at Massey's on 23 Oct.

    @Blobifie X post Counts with a second source

    c-c039a9b72031

  5. 2026-10-22 MENTION S43 transport S43 from MB2 to MAS

    Ship 43 was lifted onto the ship cryo stand, rolled out of Mega Bay 2 and set off along Highway 4 to Massey's for cryogenic proof testing.

    @Blobifie X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @LabPadre X post Counts with a second source @Blobifie X post Counts with a second source

    c-6acc6d78e0bd

  6. 2026-10-22 MENTION S43 UNCONFIRMED note about S43

    VickiCocks15 says it is possible, though impossible to tell, that Ship 43 was proof tested with ambient temperature gas; after farm vents, testing moved to test tank S39.1, where frost was just visible, its 17th test.

    @VickiCocks15 X post Counts with a second source

    c-6c3228dba175

  7. 2026-10-22 MENTION S43 UNCONFIRMED note at MB2 about S43

    VickiCocks15 reports the ship thrust sim stand moved into Mega Bay 2 overnight and Ship 43 was loaded onto it before leaving for Massey's for cryo testing.

    @VickiCocks15 X post Counts with a second source

    c-f40a40a79002

Pad

  1. 2026-10-08 UNCONFIRMED Flight 16 (Starlink 30-1) F16 NET 2026-12-10 at 39A

    CADENA advisory: Flight 15 from Starbase Pad 2 NET 8 Nov 2026; Flight 16 (Starlink 30-1), potentially LC-39A, NET 10 Dec 2026.

    @NASASpaceflight X post Counts with a second source @LabPadre X post Counts with a second source

    c-7dc009ede861

Ground notes

Notes at LC-39A whose own text names deluge, chopsticks, BQD or SQD. Newest first. A kind with no note stays open on the strip.

  1. 2026-10-25 UNCONFIRMED note at 39A

    NSF (25 Oct): SpaceX has added two more liquid methane (LCH4) storage tanks at LC-39A, completing that side of the tank farm; once hooked in, NSF puts LC-39A at nearly 5,000 metric tons of LCH4, about 3.8 stacks' worth. More liquid nitrogen capacity was also added to the deluge farm.

    NASASpaceflight Web page Counts with a second source

    c-03f9d2061ae3

  2. 2026-07-03 UNCONFIRMED note at 39A

    As of early July 2026, NSF reports LC-39A chopsticks are reeved so they can move on the tower, and ridge-cap and bucket deluge testing has begun.

    NASASpaceflight Web page Counts with a second source

    c-5eec7a5ff274

Filings

Filing claims whose effect names F16. Docket.

No FAA filing names this flight.

No FCC filing names this flight.

Launch notices

NOTAM launch area, NOTAM ship splashdown, USCG notice to mariners, NGA navigational warning, FAA operations advisory, launch road closure, wet dress rehearsal and payload loaded. Each stays open until a filing, a notice or an official post states it. A tracker mention does not close one. The same filing can also sit in the docket above.

SOURCE GALLERY

F16 in pictures & reporting

All 10 linked sources ↗

Original posts linked to F16 claims. Load a post to see the publisher's photographs, video or text.