Skip to content
StarshipDesk.

Field Journal / sourced daily

Explore
OverviewGround hardware
Feed (Atom)

FIELD JOURNAL / VEHICLE

The supporting cast.

Ground equipment and infrastructure, tracked through their source records.

FROM THE PHOTOGRAPHIC ARCHIVE

Close aerial view of Starship beside the tower, with the coast behind.
The ship beside the launch towerArchive · 15 Apr 2023 · Starship Test Flight Mission · SpaceX · CC BY-NC 2.0. Resized; display crop may apply.

Ground systems register

Ground kit

16 pieces of ground and factory hardware (cranes, launch mounts, stands, lifters) named by a sourced claim. Placement comes only from a claim that states a site. Nothing here is inferred.

  1. HW01

    4PL (four point lifter) 4PL

    Last placed: Mega Bay 2 since 2026-10-14

    2 claims

    1. 2026-10-14 transport 4PL (four point lifter) from SAN to MB2

      The 4PL used for ship lifts moved from Sanchez into Mega Bay 2 and hoisted from its stand.

      @VickiCocks15 X post Counts with a second source

      c-a2ea13c9cbeb

    2. 2026-10-14 identify hardware 4PL (four point lifter)

      The 4PL used for ship lifts moved from Sanchez into Mega Bay 2 and hoisted from its stand.

      @VickiCocks15 X post Counts with a second source

      c-0e0a93079e32

  2. HW02

    Booster workstand booster-workstand

    Last placed: KSC Turn Basin since 2026-09-05

    2 claims

    1. 2026-09-05 transport Booster workstand, SHT ship aft frame from RR to TB

      A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.

      @LabPadre X post Counts with a second source @NASASpaceflight X post Counts with a second source

      c-15c4078ad505

    2. 2026-09-05 identify hardware Booster workstand

      A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.

      @LabPadre X post Counts with a second source @NASASpaceflight X post Counts with a second source

      c-960fc6424edb

  3. HW03

    Gigabay bridge crane gigabay-bridge-crane

    Last placed: Gigabay (Starbase) since 2026-10-13

    5 claims

    1. 2026-10-15 UNCONFIRMED note at GB-TX about gigabay-bridge-crane

      USA Flag installed on the Gigabay bridge crane at Starbase.

      @NASASpaceflight X post Counts with a second source

      c-ad864eb5edba

    2. 2026-10-13 note at GB-TX about gigabay-bridge-crane

      More bridge crane testing inside Gigabay.

      @VickiCocks15 X post Counts with a second source

      c-7cc36e46e48e

    3. 2026-10-13 identify hardware Gigabay bridge crane

      More bridge crane testing inside Gigabay.

      @VickiCocks15 X post Counts with a second source

      c-68d4c568d6ec

    4. 2026-10-11 note at GB-TX about gigabay-bridge-crane

      Gigabay large bridge crane received its working load limit sign: 420.

      @AshleyKillip X post Counts with a second source

      c-c904eed41222

    5. 2026-10-11 identify hardware Gigabay bridge crane

      Gigabay large bridge crane received its working load limit sign: 420.

      @AshleyKillip X post Counts with a second source

      c-6d0f9b72ebcf

  4. HW04

    Gigabay bridge crane trolleys (two) gigabay-bridge-crane-trolleys

    Last placed: Sanchez lot UNCONFIRMED

    2 claims

    1. 2026-10-22 UNCONFIRMED note at SAN about gigabay-bridge-crane-trolleys

      Two Gigabay bridge crane trolleys were redirected to Sanchez for storage until needed for installation.

      @VickiCocks15 X post Counts with a second source

      c-60be87f35846

    2. 2026-10-22 UNCONFIRMED identify hardware Gigabay bridge crane trolleys (two)

      Identify two bridge crane trolleys for the Gigabay as hardware; they arrived and staged outside Production before going to Sanchez for storage until installation.

      @VickiCocks15 X post Counts with a second source

      c-2d0d09d1dab0

  5. HW05

    First Gigabay bridge crane (site not stated) gigabay-first-bridge-crane

    Last placed: Gigabay (Starbase) since 2026-10-18

    4 claims

    1. 2026-10-18 note at GB-TX about gigabay-first-bridge-crane

      TrackingTheSB weekly: the first of the two Gigabay bridge cranes has been lifted and installed. Each crane can lift up to 420 tonnes and covers one of the Gigabay's two aisles.

      @TrackingTheSB X post Confirms alone

      c-aace4047ae2e

    2. 2026-10-16 UNCONFIRMED note at GB-TX about gigabay-first-bridge-crane

      Blobifie reports SpaceX installed the first Gigabay bridge crane today.

      @Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source

      c-b933e44ab1a7

    3. 2026-10-15 UNCONFIRMED note about gigabay-first-bridge-crane

      LabPadre posted the full 15 Oct bridge crane lift: the strand jacks took not far short of 13 hours to pull the crane to the top of the Gigabay. The post does not say which Gigabay.

      @LabPadre X post Counts with a second source

      c-2aa3e77bdc10

    4. 2026-10-15 UNCONFIRMED identify hardware First Gigabay bridge crane (site not stated)

      LabPadre reports the first bridge crane in the Gigabay being lifted into position. The post does not say which Gigabay (Starbase or Florida).

      @LabPadre X post Counts with a second source

      c-e5271acc78e2

  6. HW06

    Starship HLS Cabin One (flight-like crew compartment) hls-cabin-one

    HLS and depot board

    Last placed: Site not stated by any source.

    4 claims

    1. 2026-10-26 UNCONFIRMED note about hls-cabin-one

      FelixSchlang reports SpaceX's Jason Tenenbaum said at the von Braun Symposium that HLS Cabin 1 gets its floor this week, SpaceX aims to finish it in a month or two for crew-in-the-loop tests with NASA crew, and the docking adapter is qualified.

      @FelixSchlang X post Counts with a second source

      c-3994f470a270

    2. 2026-10-25 UNCONFIRMED note about hls-cabin-one

      TrackingTheSB weekly: from the 23 Oct HLS update, HLS Cabin 1 is in construction at Starbase with window cutouts made, and the propellant transfer demo ship is in construction, both flights set for 2027.

      @TrackingTheSB X post Confirms alone

      c-599663d578de

    3. 2026-09-23 note about hls-cabin-one

      NASA's HLS IAC 2026 SpaceX milestone chart lists Cabin One build complete in Q4 2026, Cabin One operations testing in Q1 2027 and a Cabin One airlock demo in Q2 2027.

      NASA Web page Confirms alone @lewisknaggs42 X post Counts with a second source

      c-9b1444b88b47

    4. 2026-09-23 identify hardware Starship HLS Cabin One (flight-like crew compartment)

      Identify Cabin One as hardware: NASA's HLS IAC 2026 presentation names a Cabin One flight-like Starship HLS crew compartment build at Starbase.

      NASA Web page Confirms alone

      c-dff146751295

  7. HW07

    Starship HLS (Artemis lunar lander) hls-starship

    HLS and depot board

    Last placed: Site not stated by any source.

    3 claims

    1. 2026-10-23 note about hls-starship

      NASA says SpaceX will launch a Starship Version 3 test article to rendezvous and dock with Orion in a test expected to last up to two hours; the astronauts will not enter Starship.

      @NASAArtemis X post Confirms alone

      c-6c3c10196d85

    2. 2026-10-23 note about hls-starship

      NASA says that for Artemis IV SpaceX's Starship HLS will rendezvous and dock with Orion and its crew in low Earth orbit after tanker Starships transfer propellant to a waiting depot Starship; with Orion docked, Starship performs the trans-lunar injection burn to lunar orbit, takes two astronauts to the surface for several days and returns them to Orion.

      @NASAArtemis X post Confirms alone @NASAArtemis X post Confirms alone

      c-172f59bee8ff

    3. 2026-10-23 identify hardware Starship HLS (Artemis lunar lander)

      NASA names SpaceX's Starship HLS as one of the two Artemis landers with an updated concept of operations for Artemis IV.

      @NASAArtemis X post Confirms alone

      c-59c7309079a5

  8. HW08

    Raptor North Stand mcgregor-raptor-north

    Last placed: McGregor test site UNCONFIRMED

    2 claims

    1. 2026-10-07 UNCONFIRMED note at MCG about mcgregor-raptor-north

      Raptor North Stand at the McGregor test site; NSF reported a 557-second Raptor firing there.

      @NASASpaceflight X post Counts with a second source

      c-0c29bfd3c695

    2. 2026-10-07 UNCONFIRMED identify hardware Raptor North Stand

      Identify the Raptor North Stand at McGregor as hardware; NSF reported a 557-second Raptor firing on that stand.

      @NASASpaceflight X post Counts with a second source

      c-95d2e036b37c

  9. HW09

    OG can crusher og-can-crusher

    Last placed: Massey's test site since 2026-10-08

    2 claims

    1. 2026-10-08 transport OG can crusher to MAS

      The original can crusher moved to Massey's.

      @TrackingTheSB X post Confirms alone

      c-32d91a863eb4

    2. 2026-10-08 identify hardware OG can crusher

      The original can crusher moved to Massey's.

      @TrackingTheSB X post Confirms alone

      c-84ae2be21c4c

  10. HW10

    Pad 1 flame deflector (rebuild) pad1-flame-deflector

    Last placed: Starbase Pad 1 since 2026-10-18

    4 claims

    1. 2026-10-18 note at P1 about pad1-flame-deflector

      TrackingTheSB weekly: this week teams lifted the centre flame bucket part into the Pad 1 trench and began installing the launch mount legs. The last flight from Pad 1 was Flight 11.

      @TrackingTheSB X post Confirms alone

      c-315c655dbad4

    2. 2026-10-16 UNCONFIRMED note at P1 about pad1-flame-deflector

      Teams at Pad 1 lifted a piece of the flame bucket into place as the pad rebuild takes shape.

      @RoughRidersShow X post Counts with a second source

      c-b0b10ab55b94

    3. 2026-10-11 note at SAN about pad1-flame-deflector

      Pad 1 flame deflector under construction in the Sanchez lot; TrackingTheSB says work on it continued steadily through the week of 5 Oct.

      @TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source

      c-20437032bb02

    4. 2026-10-11 identify hardware Pad 1 flame deflector (rebuild)

      Identify the new Pad 1 flame deflector as hardware, under construction in the Sanchez lot alongside the new Pad 1 OLM and SQD arm.

      @TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source

      c-638757070511

  11. HW11

    Pad 1 orbital launch mount (rebuild) pad1-olm

    Last placed: Sanchez lot since 2026-10-11

    4 claims

    1. 2026-10-18 UNCONFIRMED note at P1 about pad1-olm

      The crane Littler Larry was lifting the second new orbital launch mount leg into position at Pad 1, in breezy conditions.

      @VickiCocks15 X post Counts with a second source

      c-8266d2703d91

    2. 2026-10-15 UNCONFIRMED identify hardware Pad 1 orbital launch mount (rebuild)

      Identify the new Pad 1 orbital launch mount as hardware; its first leg went into the flame trench.

      @Blobifie X post Counts with a second source

      c-0cf5053e6dbd

    3. 2026-10-15 UNCONFIRMED note at P1 about pad1-olm

      The first of the new Pad 1 orbital launch mount legs was installed into the flame trench.

      @Blobifie X post Counts with a second source @VickiCocks15 X post Counts with a second source

      c-c61dd0c20c22

    4. 2026-10-11 note at SAN about pad1-olm

      New Pad 1 orbital launch mount under construction in the Sanchez lot; TrackingTheSB says work on it continued steadily through the week of 5 Oct.

      @TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source

      c-30be9ab0ed78

  12. HW12

    Pad 1 SQD arm (rebuild) pad1-sqd

    Last placed: Sanchez lot since 2026-10-11

    2 claims

    1. 2026-10-11 note at SAN about pad1-sqd

      Pad 1 SQD arm under construction in the Sanchez lot; TrackingTheSB says work on it continued steadily through the week of 5 Oct.

      @TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source

      c-9c5f54525ea2

    2. 2026-10-11 identify hardware Pad 1 SQD arm (rebuild)

      Identify the new Pad 1 ship quick disconnect (SQD) arm as hardware, under construction in the Sanchez lot.

      @TrackingTheSB X post Confirms alone @RGVaerialphotos X post Counts with a second source

      c-924363991321

  13. HW13

    Pad 2 chopsticks pad2-chopsticks

    Last placed: Starbase Pad 2 since 2026-09-10

    4 claims

    1. 2026-10-16 UNCONFIRMED note at P2 about pad2-chopsticks

      Further chopstick testing at Pad 2.

      @VickiCocks15 X post Counts with a second source

      c-793f722ba51a

    2. 2026-10-15 UNCONFIRMED note at P2 about pad2-chopsticks

      Blobifie: SpaceX ran catch testing with the Pad 2 chopsticks at the top of the tower, and workers were seen celebrating at the top of the tower later in the day. NSF's Starbase summary of 15 Oct also shows the chopsticks run to the top of Tower 2 for high-speed tests.

      @Blobifie X post Counts with a second source @NASASpaceflight X post Counts with a second source @VickiCocks15 X post Counts with a second source

      c-289f4e9f12d0

    3. 2026-09-10 note at P2 about pad2-chopsticks

      Pad 2 chopsticks held S42 deep in the arms and lifted it a few meters during catch rehearsal.

      @TrackingTheSB X post Confirms alone

      c-bb7b05249641

    4. 2026-09-10 identify hardware Pad 2 chopsticks

      Identify the Pad 2 chopsticks as hardware used in Ship 42 catch rehearsals.

      @TrackingTheSB X post Confirms alone

      c-86913ce720d0

  14. HW14

    Pad 2 SQD arm pad2-sqd

    Last placed: Starbase Pad 2 since 2026-09-12

    2 claims

    1. 2026-09-12 note at P2 about pad2-sqd

      Pad 2 SQD arm rotated in and connected to S42 at SQD height during catch rehearsal, a rehearsal of post-catch ship safing.

      @TrackingTheSB X post Confirms alone

      c-19665b5bfbaf

    2. 2026-09-12 identify hardware Pad 2 SQD arm

      Identify the Pad 2 ship quick disconnect (SQD) arm as hardware used when S42 was lowered to SQD height and the SQD was connected during catch rehearsal.

      @TrackingTheSB X post Confirms alone

      c-30a10b89e0e6

  15. HW15

    Ship Work Stand ship-work-stand

    Last placed: KSC Turn Basin UNCONFIRMED

    2 claims

    1. 2026-10-15 UNCONFIRMED note at TB about ship-work-stand

      The Ship Work Stand was offloaded You'll Thank Me Later at the KSC turn basin.

      @NASASpaceflight X post Counts with a second source

      c-e823643362ee

    2. 2026-10-15 UNCONFIRMED identify hardware Ship Work Stand

      Identify the Starship Ship Work Stand as hardware seen at the Florida turn basin.

      @NASASpaceflight X post Counts with a second source

      c-6b87c2c8427b

  16. HW16

    SHT ship aft frame sht-ship-aft-frame

    Last placed: KSC Turn Basin since 2026-09-05

    2 claims

    1. 2026-09-05 transport Booster workstand, SHT ship aft frame from RR to TB

      A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.

      @LabPadre X post Counts with a second source @NASASpaceflight X post Counts with a second source

      c-15c4078ad505

    2. 2026-09-05 identify hardware SHT ship aft frame

      A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.

      @LabPadre X post Counts with a second source @NASASpaceflight X post Counts with a second source

      c-e0dffc94fd11