Skip to content
StarshipDesk.

Field Journal / sourced daily

Explore
OverviewMovement map
Feed (Atom)

FIELD JOURNAL / PLACE

Where the programme moves.

Trace vehicles between places, then follow each movement back to its source.

FROM THE PHOTOGRAPHIC ARCHIVE

Wide view of the Starbase launch tower beside the water at sunset.
A launch site on the Gulf coastArchive · 15 Apr 2023 · Starship Test Flight Mission · SpaceX · CC BY-NC 2.0. Resized; display crop may apply.

Movement

Section map

Every wire is a move a claim states. Unknown means the claim did not name a from. A stacked section that only follows a later vehicle move is not a second wire.

  • Dotted wire: roll.
  • Heavy wire: lift.
  • Solid wire: transport.
  • Orange dash: unconfirmed.
  • The plate on a wire is the number of claims on that route.
  • Hover or focus a wire to mark its row. Hover or focus a row to mark its wire. A tap toggles that mark.
Section movement map 2026-09-05 transport Booster workstand + SHT ship aft frame2026-09-08 roll B23 AX:22026-09-08 transport B222026-09-09 roll B23 F2:42026-09-12 transport B222026-09-27 roll S44 FX:4 + N:32026-09-27 roll B24 A2:42026-10-02 roll B24 A5:42026-10-04 transport S39.12026-10-05 roll S44 A2:42026-10-07 transport S402026-10-07 roll B24 A6:42026-10-07 roll B24 CH4 landing tank2026-10-07 transport S402026-10-08 roll B24 Transfer tube2026-10-08 transport OG can crusher2026-10-09 transport S422026-10-10 transport S422026-10-10 transport S402026-10-12 lift S402026-10-12 lift B232026-10-13 transport B232026-10-14 roll B24 LOX landing tank2026-10-14 transport 4PL (four point lifter)2026-10-18 transport B232026-10-20 roll S44 AX:42026-10-22 transport S432026-10-24 transport B222026-10-24 roll S452026-10-25 transport S432026-10-26 transport S422026-10-26 transport B222026-10-26 transport S432026-10-27 transport S432026-10-28 transport B232026-10-29 transport S422026-10-30 transport B232026-11-07 roll S402026-11-09 transport B22 SFCStarfactoryStarfactory, Starbase. Section fabricationMB1Mega Bay 1Mega Bay 1, Starbase. Booster stackingMB2Mega Bay 2Mega Bay 2, Starbase. Ship stackingRYRing yardRing yard, Starbase. StagingGB-TXGigabay (Starbase)Gigabay (Starbase), Starbase. Next generation integration hall, under constructionSANSanchez lotSanchez lot, Starbase. Ground hardware and pad component assemblyMASMassey's test siteMassey's test site, Starbase. Cryo proof and static fire testingP1Starbase Pad 1Starbase Pad 1, Starbase. Launch pad, being rebuiltP2Starbase Pad 2Starbase Pad 2, Starbase. Launch padPoBPort of BrownsvillePort of Brownsville, Starbase. Sea logisticsMAS2Massey's #2 siteUNCONFIRMEDMassey's #2 site, Starbase. Under construction Provisional.39ALC-39ALC-39A, Florida. Starship launch tower at Kennedy Space Center37SLC-37SLC-37, Florida. Planned Starship launch complex, Cape CanaveralRRRoberts RoadRoberts Road, Florida. Florida Starship production campusGB-FLGigabay (Florida)Gigabay (Florida), Florida. Planned integration hallTBKSC Turn BasinKSC Turn Basin, Florida. Sea logisticsMCGMcGregor test siteMcGregor test site, McGregor. Raptor engine testingSBLAStarbase, LouisianaStarbase, Louisiana, Louisiana. Planned spaceportSEAAt sea / downrangeAt sea / downrange, At sea. Recovery and transit UNKNOWNclaim named no fromOrigin is unknown when a move claim does not name a from. 6SFC to MB1, 6 roll4Unknown to MB2, 4 roll, lift3Unknown to MB1, 3 roll, lift3MAS to MB1, 3 transport3MAS to MB2, 3 transport1P2 to MB1, 1 transport1P2 to MB2, 1 transport1SAN to MB2, 1 transport3Unknown to MAS, 3 transport3MB1 to MAS, 3 transport2MB1 to P2, 2 transport2MB2 to MAS, 2 transport1Unknown to P2, 1 transport1Unknown to PoB, 1 transport1MB2 to GB-TX, 1 roll1MB2 to RY, 1 roll1PoB to SAN, 1 transport1RR to TB, 1 transport1SEA to PoB, 1 transport Starbase productionStarbaseFloridaMcGregorLouisianaAt sea
Sites are a terminal strip. Production bays are the tall plates. Pieces, dates, and how sit in the route list. A site with no claimed move stays on the strip.

Routes

39 claimed moves, 19 routes.

  1. SFC to MB1 6 roll

    1. 2026-09-08 roll B23 AX:2 c-cf88d6f1d4ac
    2. 2026-10-02 roll B24 A5:4 c-e359a91b19a5
    3. 2026-10-07 roll B24 A6:4 c-97af2ce5756b
    4. 2026-10-07 roll B24 CH4 landing tank c-31a3d179a70e
    5. 2026-10-08 roll B24 Transfer tube c-b4153be772d9
    6. 2026-10-14 roll B24 LOX landing tank c-6c55320d4099
  2. Unknown to MB2 4 roll, lift

    1. 2026-09-27 roll S44 FX:4 + N:3 c-af700e893d8c
    2. 2026-10-05 roll S44 A2:4 c-1e79fbb08c66
    3. 2026-10-12 lift S40 c-c315fbfe713f
    4. 2026-10-20 roll S44 AX:4 c-a6c1e44cddc4
  3. Unknown to MB1 3 roll, lift

    1. 2026-09-09 roll B23 F2:4 c-6c712e92b0ff
    2. 2026-09-27 roll B24 A2:4 c-ff4fd9d58c2c
    3. 2026-10-12 lift B23 c-6035f45c4d1d
  4. MAS to MB1 3 transport

    1. 2026-09-12 transport B22 c-27f4f91731a7
    2. 2026-10-18 transport B23 c-1c97cb812751
    3. 2026-10-30 transport B23 c-24cbe042af21
  5. MAS to MB2 3 transport

    1. 2026-10-10 transport S42 c-b2d77c3080f0
    2. 2026-10-25 transport S43 c-048623d211ce
    3. 2026-10-29 transport S42 c-86f5d3e88837
  6. P2 to MB1 1 transport

    1. 2026-10-26 transport B22 c-e2dea9fadb10
  7. P2 to MB2 1 transport

    1. 2026-10-27 transport S43 c-ce15947922bf
  8. SAN to MB2 1 transport

    1. 2026-10-14 transport 4PL (four point lifter) c-a2ea13c9cbeb
  9. Unknown to MAS 3 transport

    1. 2026-10-04 transport S39.1 c-12d4a0252338
    2. 2026-10-08 transport OG can crusher c-32d91a863eb4
    3. 2026-10-26 transport S42 c-7f5bc56c3208
  10. MB1 to MAS 3 transport

    1. 2026-09-08 transport B22 c-17980b3cada0 UNCONFIRMED
    2. 2026-10-13 transport B23 c-2d6f81b4f7d1
    3. 2026-10-28 transport B23 c-95ba597c2974
  11. MB1 to P2 2 transport

    1. 2026-10-24 transport B22 c-1ebcf26864d3
    2. 2026-11-09 transport B22 c-a6c68d05514b
  12. MB2 to MAS 2 transport

    1. 2026-10-09 transport S42 c-a5f8bc8925a1
    2. 2026-10-22 transport S43 c-6acc6d78e0bd
  13. Unknown to P2 1 transport

    1. 2026-10-26 transport S43 c-0591c6539aff
  14. Unknown to PoB 1 transport

    1. 2026-10-07 transport S40 c-2bfac7e46f4a UNCONFIRMED
  15. MB2 to GB-TX 1 roll

    1. 2026-11-07 roll S40 c-2284b3692a0a
  16. MB2 to RY 1 roll

    1. 2026-10-24 roll S45 c-4e09ad3cac23 UNCONFIRMED
  17. PoB to SAN 1 transport

    1. 2026-10-10 transport S40 c-4be5f2e82dad
  18. RR to TB 1 transport

    1. 2026-09-05 transport Booster workstand + SHT ship aft frame c-15c4078ad505
  19. SEA to PoB 1 transport

    1. 2026-10-07 transport S40 c-53007cc4b9c5