ship
S43 Ship 43
Body at Mega Bay 2
Test cryo at MAS on 2026-10-23.
Flights: F16 ship UNCONFIRMED c-414aea6fef9f.
Build strip 3 Oct to 16 Nov, 18 marks. Hover or tap a mark for its claim.
History
Status: Assigned to F16. All vehicles
Flights
- F16 as ship UNCONFIRMED (assign c-414aea6fef9f): not flown yet
Milestones
No sourced production, test or rollout milestone read yet. The tape below has every dated claim.
Body
- 2026-10-22 from mb2 to masseys claim
- 2026-10-25 from masseys to mb2 claim
- 2026-10-26 to pad2 claim
- 2026-10-27 from pad2 to mb2 claim
Sections
No section claims.
Tape
-
2026-11-03 UNCONFIRMED note at P2 about S43
FelixSchlang says SpaceX recently lifted Ship 43 to catch height at Pad 2 for catch practice (photo by Jordan Guidry, WAI Media).
@FelixSchlang X post Counts with a second source
-
2026-10-27 transport S43 from P2 to MB2
Ship 43 left Pad 2 late on 27 Oct (local time) after its chopstick tests, arrived back at the production site and entered Mega Bay 2.
@TrackingTheSB X post Confirms alone @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @NASASpaceflight X post Counts with a second source
-
2026-10-27 note at P2 about S43
Ship 43 was lifted by the Pad 2 chopsticks with the landing rails deployed and moved back and forth, checking the rails and push rods after the previous night's SQD interface tests; Blobifie says this post-catch pusher test went much smoother than with Ship 42.
@VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source @FelixSchlang X post Counts with a second source
-
2026-10-27 UNCONFIRMED note at P2 about S43
Blobifie says Ship 43 was moved to the middle of the Pad 2 chopsticks and lifted, a test simulating moving the ship forward after a catch so the stabilizer arms can engage.
@Blobifie X post Counts with a second source
-
2026-10-26 note at P2 about S43
At Pad 2 the chopsticks lifted Ship 43 above its transport stand and up to the top of the tower, then lowered it to the height of the ship quick disconnect (SQD) arm, which connected to it: practice for post-catch safing operations.
@Blobifie X post Counts with a second source @Blobifie X post Counts with a second source @NASASpaceflight X post Counts with a second source @FelixSchlang X post Counts with a second source @RGVaerialphotos X post Counts with a second source @VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source
-
2026-10-26 transport S43 to P2
Ship 43 departed the production site and arrived at Pad 2 for chopstick testing.
@RGVaerialphotos X post Counts with a second source @VickiCocks15 X post Counts with a second source @Blobifie X post Counts with a second source @LabPadre X post Counts with a second source
-
2026-10-26 UNCONFIRMED note about S43
Ship 43 left the production site heading to Pad 2 under a Production to Pad road delay; NASASpaceflight and lewisknaggs42 say it is likely for chopstick catch tests.
@NASASpaceflight X post Counts with a second source @lewisknaggs42 X post Counts with a second source
-
2026-10-26 UNCONFIRMED note at MB2 about S43
Ship 43 was lifted from the cryo stand at Mega Bay 2 as Booster 22 returned, and the cryo stand then rolled back to Sanchez.
@VickiCocks15 X post Counts with a second source
-
2026-10-26 UNCONFIRMED note at P2 about S43
Blobifie says Ship 43 went back onto its transport stand after the Pad 2 SQD connection test, and that the post-flight safing practice went much smoother than the same test with Ship 42.
@Blobifie X post Counts with a second source
-
2026-10-25 transport S43 from MAS to MB2
Ship 43 left Massey's after its cryo proof testing and rolled up Highway 4 back to Mega Bay 2 at the production site overnight (local night of 25 Oct).
@NASASpaceflight X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @FelixSchlang X post Counts with a second source @VickiCocks15 X post Counts with a second source
-
2026-10-23 UNCONFIRMED note at MAS about S43
Blobifie says Ship 43 completed two cryogenic proof tests at Massey's on 23 Oct.
@Blobifie X post Counts with a second source
-
2026-10-23 cryo S43 at MAS
Ship 43 started its first cryogenic proof test at Massey's on the evening of 23 Oct.
@TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @VickiCocks15 X post Counts with a second source
-
2026-10-22 UNCONFIRMED note at MB2 about S43
VickiCocks15 reports the ship thrust sim stand moved into Mega Bay 2 overnight and Ship 43 was loaded onto it before leaving for Massey's for cryo testing.
@VickiCocks15 X post Counts with a second source
-
2026-10-22 UNCONFIRMED note about S43
VickiCocks15 says it is possible, though impossible to tell, that Ship 43 was proof tested with ambient temperature gas; after farm vents, testing moved to test tank S39.1, where frost was just visible, its 17th test.
@VickiCocks15 X post Counts with a second source
-
2026-10-22 UNCONFIRMED note at MAS about S43
Ship 43 moved its flaps at Massey's.
@VickiCocks15 X post Counts with a second source
-
2026-10-22 transport S43 from MB2 to MAS
Ship 43 was lifted onto the ship cryo stand, rolled out of Mega Bay 2 and set off along Highway 4 to Massey's for cryogenic proof testing.
@Blobifie X post Counts with a second source @TrackingTheSB X post Confirms alone @Blobifie X post Counts with a second source @RGVaerialphotos X post Counts with a second source @LabPadre X post Counts with a second source @Blobifie X post Counts with a second source
-
2026-10-09 UNCONFIRMED assign S43 as ship on F16
Assign Ship 43 as the ship on Flight 16. NSF names S43 with B23 for the first LC-39A Starship flight (Starlink Group 30-1).
NASASpaceflight Web page Counts with a second source @NASASpaceflight X post Counts with a second source
-
2026-10-09 UNCONFIRMED note at MB2 about S43
Ship 43 is inside Mega Bay 2 finishing internals and is still missing its starboard-side aft flap. NSF says it was fully stacked on 15 Sep 2026.
NASASpaceflight Web page Counts with a second source