2026-W37

7 Sept 2026 to 13 Sept 2026

18 claims: 13 CONFIRMED, 5 UNCONFIRMED

Grouped by the site stated in the claim; moves use their destination. No site means no site was stated. A claim naming several vehicles or hardware items appears once under a combined group.

mb1 Mega Bay 1

B22

  1. move CONFIRMED

    Booster 22 finished cryo proof testing at Massey's and was moved back to Mega Bay 1 at the production site.

    c-27f4f91731a7

B23

  1. move CONFIRMED

    Booster 23 F2:4 section rolled into Mega Bay 1, the start of its CH4 tank.

    c-6c712e92b0ff

  2. move CONFIRMED

    Booster 23 AX:2 section rolled across from Starfactory into Mega Bay 1, before its landing tank had been seen.

    c-cf88d6f1d4ac

masseys Massey's test site

B22

  1. note UNCONFIRMED

    Blobifie says Booster 22 completed what looked to have been a partial cryo test at Massey's and was then detanked.

    c-2d19b3126d8e

  2. test CONFIRMED

    Booster 22 completed a full cryo test at Massey's, filled and held at pressure before detanking, from the afternoon into the night of 9 Sep.

    c-97e41ed079ec

  3. move UNCONFIRMED

    Booster 22 rolled from Mega Bay 1 to the Massey's test site and was lifted onto the cryo stand for cryo proof testing.

    c-17980b3cada0

pad1 Starbase Pad 1

Site and other claims

  1. note CONFIRMED

    Reported 13 Sep 2026: Pad 1 tower had its roof reinstalled early in the week of 7 Sep, after it was taken down for modifications.

    c-8adbfedefc93

pad2 Starbase Pad 2

pad2-chopsticks

  1. note CONFIRMED

    Pad 2 chopsticks held S42 deep in the arms and lifted it a few meters during catch rehearsal.

    c-bb7b05249641

pad2-sqd

  1. note CONFIRMED

    Pad 2 SQD arm rotated in and connected to S42 at SQD height during catch rehearsal, a rehearsal of post-catch ship safing.

    c-19665b5bfbaf

S42

  1. test CONFIRMED

    Ship catch rehearsal at Pad 2: S42 was lifted to catch height and back down to SQD height, the SQD rotated in and connected, then S42 was rotated, flaps tucked, and lowered onto its transport stand.

    c-3c911339ea58

  2. test CONFIRMED

    Ship catch rehearsal at Pad 2: S42 was placed deep in the chopsticks and lifted a few meters, then the chopstick pushers moved it to the stabilizer engagement position and the stabilizers were engaged.

    c-5e1953d56a83

Site and other claims

  1. note CONFIRMED

    Pad 2 OLM ran a further deluge test.

    c-509afe456ce6

  2. note CONFIRMED

    Pad 2 OLM ran a full launch-to-catch deluge operation.

    c-42cd710b9851

lc39a LC-39A

Site and other claims

  1. note UNCONFIRMED

    NSF (25 Oct): SpaceX has begun activation testing of all LC-39A pad systems, with the tower vent first activated on 12 Sep, which helped fully purge and test the ship-side systems.

    c-5f11b92cd2b5

No site

pad2-chopsticks

  1. identify CONFIRMED

    Identify the Pad 2 chopsticks as hardware used in Ship 42 catch rehearsals.

    c-86913ce720d0

pad2-sqd

  1. identify CONFIRMED

    Identify the Pad 2 ship quick disconnect (SQD) arm as hardware used when S42 was lowered to SQD height and the SQD was connected during catch rehearsal.

    c-30a10b89e0e6

Site and other claims

  1. filing UNCONFIRMED

    SpaceX filed FCC STA 1782-EX-ST-2026 (call sign WA9XYF) for on-ground testing only of Starship Super Heavy vehicle communications at its Boca Chica and Brownsville TX test facilities, adding ship and booster frequencies; requested operation 4 Oct to 14 Dec 2026. Record status Pending, status date 11 Sep 2026.

    c-556920a7ea53

  2. filing UNCONFIRMED

    SpaceX via Trinity Consultants filed TCEQ Air New Source Registration 185303 (pending) for a Boca Chica Facility north of Hwy 4 near the Port of Brownsville: an initial configuration of about 748 MW from 35 temporary natural-gas turbines, then about 708 MW from eight GE Vernova 7E units, with SIC 7374 computer processing and NAICS electric power generation. Construction and operation starts are listed TBD. Not an approval.