note CONFIRMED
The TrackingTheSB weekly says Booster 25's A4:4 section joined the rest of the booster in Mega Bay 1 on Saturday 7 Nov, after its A3:4 section rolled in on Thursday.
note UNCONFIRMED
Flight2Starship says Booster 25's 3rd section was moved into Mega Bay 1 for stacking (photo credit Avidspace). The starship-tracking live feed the same evening names the section A3:4 rolled into Megabay 1.
identify CONFIRMED
Identify Booster 25. Its common dome section and A2 section rolled into Mega Bay 1.
Site and other claims
note CONFIRMED
Booster 25's common dome section entered Mega Bay 1, and its A2 section followed later that day to be joined with it. These are the first B25 sections in the bay.
mb2 Mega Bay 2
S45
note CONFIRMED
Ship 45's transfer tubes, pre-loaded on the installation jig, rolled through the Gigabay into Mega Bay 2. VickiCocks15 says the four point lifter went into Mega Bay 2 first to lift S45, then the transfer tube jig, then a single Raptor engine.
note UNCONFIRMED
VickiCocks15 says Ship 45's A3:4 section moved into Mega Bay 2 on the evening of 5 Nov. A later clip the next morning says S45 picked up that A3:4 section overnight, with one more section left before the stack is complete.
note UNCONFIRMED
VickiCocks15 says the Ship 45 A2:3 section was relocated from Starfactory into Mega Bay 2 on the morning of 3 Nov.
gigabay-tx Gigabay (Starbase)
S40
move CONFIRMED
Ship 40 was lifted onto a transport stand in Mega Bay 2, rolled out of Mega Bay 2 and moved into a Gigabay work cell, the first vehicle to enter the Gigabay. The TrackingTheSB weekly says it went around Sanchez and the parking garage to the front of the Gigabay, with visible rust and damage to both flaps.
Site and other claims
note UNCONFIRMED
Niall Anderson posted a photo (by lifeatstagezero) showing Starfactory and Gigabay being joined together; ChromeKiwi notes the connecting structure between them is fairly substantial.
masseys Massey's test site
S43.1
note UNCONFIRMED
RGVaerialphotos shows Ship 43.1 in the can crusher at Massey's.
Site and other claims
note UNCONFIRMED
VickiCocks15 says the 6 to 7 Nov road delay was used to move one of the large valve skids from Sanchez to Massey's; RGVaerialphotos says cryo plumbing sections built in the Sanchez lot were moving to Massey's on 8 Nov.
note UNCONFIRMED
Two Production to Massey's road delays on Texas State Highway 4: 23:59 Friday 6 Nov to 04:00 Saturday 7 Nov CT, and 23:59 Saturday 7 Nov to 04:00 Sunday 8 Nov CT.
note UNCONFIRMED
VickiCocks15 says the Massey's LR11000 crane removed a reaction frame from the Super-crusher on 3 Nov, after moving on from the LOX header tank structure the day before; a beam was removed on 30 Oct.
pad1 Starbase Pad 1
Site and other claims
note UNCONFIRMED
The dead-line spool for the Pad 1 drawworks reached the launch site, driving through the D1 gate toward the pad.
pad2 Starbase Pad 2
S43
note UNCONFIRMED
FelixSchlang says SpaceX recently lifted Ship 43 to catch height at Pad 2 for catch practice (photo by Jordan Guidry, WAI Media).
Site and other claims
note UNCONFIRMED
VickiCocks15 says the Pad 2 BQD was extended and retracted, and the booster hold-down clamps were retracted and extended one by one and then retracted together, on the evening of 8 Nov.
note CONFIRMED
Pad 2 on the morning of 8 Nov: the chopsticks rose up the tower, the launch mount top deck and the deluge farm were primed, and launch and catch deluge run-throughs were performed. The TrackingTheSB weekly counts seven Pad 2 deluge tests in the week to 8 Nov.
schedule CONFIRMED
SpaceX says Flight 15 is preparing to launch as soon as Friday 13 Nov 2026, pending regulatory approval, from Starbase. NSF says SpaceX tested the launch site systems ahead of rolling both vehicles to Pad 2.
note UNCONFIRMED
Pad 2 on 6 Nov: VickiCocks15 reports booster hold-down clamp testing and the launch mount service structure moved closer to Pad 1 in the morning. That evening the chopsticks were raised part way up the tower, the BQDs were extended, purged and retracted, deluge tests ran the launch and catch sequences again, then the BQDs were extended again and the chopsticks lowered. RGVaerialphotos posted the deluge testing.
schedule UNCONFIRMED
Flight 15 moved one day to NET 13 Nov 2026 per the Nov 5 CADENA FAA planning slide (was 12 Nov). LabPadre, FelixSchlang and lewisknaggs42 all cite the slide; LabPadre notes these are tentative planning dates, not NOTAMs. No Flight 15 launch licence is public yet.
note UNCONFIRMED
Pad 2 deluge system testing continued on 5 Nov: VickiCocks15 recorded a launch-and-catch deluge scenario earlier and one further Pad-2 deluge test that night; Blobifie reports about three deluge tests plus catch testing over roughly 48 hours; RGVaerialphotos posted a Pad 2 chopstick and deluge testing timelapse.
note UNCONFIRMED
VickiCocks15 says work was going on at both the LOX and the CH4 booster quick disconnects (BQDs) at Pad 2, to make sure they are ready for Flight 15.
No site
S39.1
note UNCONFIRMED
TrackingTheSB Starbase This Week (8 Nov) says SpaceX cut test tank S39.1 in half, ending its career as one of the test tanks at Massey's.
Site and other claims
note CONFIRMED
SpaceX Flight 15 page: the booster's primary objective is launch, ascent, stage separation, boostback and return to the launch site for catch, the first catch attempt for a Super Heavy V3 booster. The ship's primary objectives are deploying 26 Starlink V3 satellites and the first return to launch site and catch at Starbase, after about 14 orbits at about 275 km over more than 22 hours. The ship returns only if the systems critical for reentry, landing burn and tower approach are healthy.
note CONFIRMED
SpaceX's Flight 15 page says Ship 42 is to deploy 26 Starlink V3 satellites, three of them carrying cameras to scan the heatshield, then orbit at about 275 km for about 14 orbits over more than 22 hours before returning to Starbase for the first ship catch. The page calls it the first flight planned to return both Starship and Super Heavy for catch.
note UNCONFIRMED
LabPadre reports NOTAM A0106/26 in the Mauritius FIR, 13 Nov 16:53 CST to 19 Nov 19:14 CST, which VickiCocks15 calls a NOTAM for Starship reentry.
note CONFIRMED
SpaceX Flight 15 page: the 75-minute launch window opens at 4:45 p.m. CT on Friday 13 Nov (17:45 to 19:00 ET), and the live webcast starts about 30 minutes before liftoff on spacex.com and on X @SpaceX, with coverage planned through ship catch.
note CONFIRMED
SpaceX released the Go For Orbit episode, calling the upcoming launch the first orbital Starship launch carrying advanced Starlink satellites bound for space.
note CONFIRMED
Elon Musk says SpaceX will attempt to catch both the Super Heavy booster and Starship on the upcoming flight, and that if both succeed it will be the first time all parts of an orbital rocket return to Earth intact.